Dam Owner Notifies MPA the Boards are Going In!..... WHEN?

Here's the lake from the launch at the Public Access Boat ramp on Manchaug Pond this afternoon.

At 4:45, the water was still pouring though the spillway and low level outlet to leave Manchaug Pond lower still.


The MPA President did speak with the attorney for the dam owner as to what is going on. He reports the boards are going in.... WHEN?



I'll report more later...

1 comment:

  1. not only do the boards have to go back in,but the hand control side has to be closed as well.more water is going out through there than the board side